Project Overview

Project Number
M10692
Total Grant Value
$249,000
Program Area
MRIWA Contribution
$20,000
Project Theme
Downstream Processing Technology
Project Period
2026 - 2027

The Challenge

Handling and shipping of DRI/HBI is a difficult matter. The pyrophoric nature of the fines means that some reduction in surface area is required before they materials can be easily handled and transported any distance to limit exothermic oxidation of the reduced material.

There are several rules about density and form before the materials can be transport in a ship with a Nitrogen blanket gas being required. In general, DRI fines and pellet products are briquetted (HBI) before being shipped overseas. The current minimum density requirement for HBI is 5.0 SG as specified by the International Solid Bulk Cargoes (IMSBC) code. This density is hard to achieve for DRI fines produced from the relatively high gangue ores from the Pilbara. This project will examine the nature and properties of high gangue materials that contribute to the speciic density and stability of DRI.

Proposed Solution

To review the current safety rules around handling DRI fines (i) within a plant and (ii) transport,

This will include the scientific basis for the current rules, a review of any relevant tests developed to measure key quantities and  the outcomes from the current studies in the EU.

  1. Developing an experimental technique for measuring how quickly DRI fines oxidise under standard conditions (agglomerated or unagglomerated).
  2. Developing experimental technique for briquetting DRI fines into several shapes and sizes using a range of temperature and pressures (linking were possible with the existing ARENA HILT CRC project on Derisking Fluidised Beds where a briquetting technique is being tested by University of Adelaide)
  3. Carrying a systematic study of selected DRI fines produced from Australian ores using the techniques described above.
  4. Working with personnel from Calix to assess the melting behaviour of these different forms
  5. Carrying out a preliminary Techno-economic assessment of the agglomeration and non-agglomeration options

Proposed Benefits to WA

Understanding the safe handling of DRI fines and HBI will assist the development of green iron projects in the state and the ability to transport products to different markets.

Funding DOI

10.71342/920502737396